Using delivery plans can reduce processing times and reduce the paperwork you encounter. A delivery plan can replace many discrete orders or devotional orders. Classifications are established for appointments. Suppose you have material obtained from a contract. If you want delivery in certain days with the schedule, you can maintain the schedule agreement. In the source list, you maintain the credit pointer, plan the agreement with the validity dates and what agreement is relevant to mrp. An RV-Outline Agreement Requisition order request can be created manually by a customer with retail items (item category – Foreign work). The order requirement can be converted into a delivery plan. The delivery plan is subject to approval on the basis of pre-defined parameters before generating a delivery plan or schedules (manual or implementation) and transmitting them to the subcontractor. Delivery is established and goods are ordered and delivered to the subcontractor.

With the delivery of the finished equipment, the receipt of the goods is established. The billing process is then triggered. In the source list, we need to ensure that a reference to the delivery plan is included and that the field “Using the Source List in Material Planning (MRP) ” is placed at “2 records relevant to the layout.” Mr. Sched. Lines generated automatically if we want to automatically create plan lines. As explained in SAP note 83343, the provision does not verify the target amount of the agreement and can make refuelling proposals exceeding this amount: bypassing the problem to limit the quantity is to use a quota agreement with a maximum quantity. Hello All, I try to create scheduline lines automatically over layout for the delivery plan. When I direct MRP (MD02), the `A` status is displayed for the corresponding hardware in MD04. I click with the right mouse button on the hardware and `convert PR to PO`, it leads me to the delivery plan window, but I can`t see the plan lines that have been created. The following settings have been maintained: 1. Establishes a delivery plan 2. The source list well maintained with a fixed supplier and with layout setting `2` The hardware is an AFS equipment Any help is much appreciated.

Greetings, Imran If you keep 2 against the sch agreemetn mrp generate the calendar line that you can see in md04. These delivery plans are also updated in the delivery plan (t cod ME33). If you run mrp in the first screen presentation shots – you need to create 3 Hi Imran time lines, can you change your settings to md02? Only to confirm that you are running calendar agreements with the “Establish Calendar Agreements” option or that you are creating appointments in the selected open period.